The short answer
A standard process that rarely changes favours a package; a specific process that changes often favours a custom build. In practice the choice usually converges on the middle — a standard product with the parts that need it fitted.
A standard process that rarely changes favours a package; a specific process that changes often favours a custom build. In practice the choice usually converges on the middle — a standard product with the parts that need it fitted.
A standard process that rarely changes favours a package; a specific process that changes often favours a custom build. In practice the choice usually converges on the middle — a standard product with the parts that need it fitted.
The same criteria applied to both.
| Criterion | Package | Custom |
|---|---|---|
| Time to first value | Fast — proven functionality out of the box | Slow — starts from requirements definition |
| Fit to unusual processes | Difficult beyond the standard scope | Can be matched exactly |
| Response to change | Follows vendor policy and release cycle | Changed when needed |
| Initial cost | Comparatively predictable | Varies widely with scope |
| Maintenance | Handled by the vendor | Requires in-house capability or a contract |
| Upgrades | A standard upgrade path exists | Planned and executed yourself |
The answer changes with conditions.
The realistic choice is usually standard base plus targeted fit. Use proven product for what every plant shares — work orders, results, inventory — and fit only what differs, such as equipment integration and floor screens.
For that to work the product must support two things: an equipment integration layer separated well enough that adding a machine does not touch the core, and floor screens changeable without development.
IYULAB built exactly that structure, with Resource Lake absorbing equipment differences and UBoard composing screens without code.
Questions that come up during comparison.
You can, within limits. Heavy modification closes off the upgrade path and eventually produces a maintenance burden similar to a custom build.
You own it, along with the risk that maintenance becomes difficult when the people who built it leave. Documentation and handover planning have to be part of it.
It removes licence cost, not build and maintenance labour. Licences are a smaller share of total cost than most people expect.
A package, in the short term. But fast delivery means little if the fit is wrong and the floor does not use it, so confirming fit first is the safer sequence.
Your current systems and site conditions narrow the options quickly.
Request a site survey