Welding & Fabrication

Welding and fabrication
smart factory

Welding is a process where the result alone rarely explains the conditions. Who welded which joint, to which drawing and when, has to be retained before quality issues and audit requests can be answered.

Implementation sequence

  1. Per-joint history is not retained

    A single product may have dozens or hundreds of weld joints, yet the log records only "unit N welding complete".

  2. Distributing and recalling drawings is a job in itself

    Dust and spatter destroy paper quickly.

  3. Progress is not visible in real time

    How far the schedule has actually progressed only becomes clear when logs are collected in the evening — too late to see delivery risk and reassign people.

Where welding and fabrication plants get stuck

Problems that come up repeatedly in implementation discussions.

Field issue

Per-joint history is not retained

A single product may have dozens or hundreds of weld joints, yet the log records only "unit N welding complete". When one joint has a problem, who welded it under what conditions is unknown.

Field issue

Distributing and recalling drawings is a job in itself

Dust and spatter destroy paper quickly. Every revision means printing, distributing and collecting the old copies again.

Field issue

Progress is not visible in real time

How far the schedule has actually progressed only becomes clear when logs are collected in the evening — too late to see delivery risk and reassign people.

Field issue

Audit packages are assembled by hand every time

Regulated products such as pharmaceutical vessels require operator qualification, weld conditions and NDT results submitted together. Scattered records mean re-collating for every submission.

What gets connected

Machine signals and floor entry combined into history.

What is connectedHow it is collectedWhat it produces
Drawing revisionEngineering folder or PDM integrationOnly current drawings distributed to tablets
Weld jointJoints defined from the drawingPer-joint instruction and completion history
Operator and qualificationEmployee and qualification recordsOnly qualified operators perform the work
Weld conditionsManual entry or welder integrationDeviation checking, quality cause analysis
Inspection results (RT, PT, UT)Inspection entryPer-joint pass/fail and rework history

Build sequence

Nothing is converted all at once. High-impact areas are built and verified first.

  1. STEP 01

    Define drawings and joints

    Digitise drawings and define weld joints. Once the joint is the unit, there is somewhere for history and inspection results to attach.

  2. STEP 02

    Distribute tablets to the floor

    Make the drawing and instruction visible at the work position. The recall burden and the risk of working to an old revision disappear together.

  3. STEP 03

    Collect work history

    Record start and completion per joint with the operator. Entry has to be a couple of taps for the data to actually accumulate.

  4. STEP 04

    Connect inspection and audit

    Attach NDT results and operator qualification to the history so submission packages are produced by query.

Applied solutions

Scope is composed after reviewing equipment and workflow.

Related case studies

Each case states its disclosure scope and the basis for its figures.

Quick Answers

Welding and fabrication — frequently asked

Questions that come up on welding and fabrication floors.

Do we have to define every weld joint?

Not necessarily. Define the joints that carry quality risk or are subject to inspection, and group the rest by operation. It is a balance between management effort and the traceability you need.

Can weld conditions be read from the machine?

Where the welder supports communication, yes. Where it does not, conditions are captured as entry. Either way the history exists, which is the objective.

Is operator qualification managed in the system too?

Registering qualifications lets work requiring them be assigned to, or recorded against, qualified people. That information then appears in the audit package.

Will tablets survive dust and spatter?

Protective cases and mounting handle it. Work positions and movement patterns are reviewed first to choose between fixed and handheld.

How are inspection results linked?

The inspector selects the joint and enters the result and remarks, which attach to that history. A failure triggers a rework instruction, and that history is retained as well.

Welding and fabrication: start with a survey

Communication methods and data condition are established first, then scope is agreed.