Implementation
Paper distribution was replaced with tablet-based instructions and direct shop-floor result entry.
Outcome
With welders receiving instructions and entering results on the tablet on the spot, every process step left a record in the system for full visibility, and the cost of printing drawings and instructions was eliminated entirely.
Validation method
The availability of progress records and paper drawing and instruction costs were compared for the target process.
Terms used in this case study
Definitions follow the IYULAB manufacturing glossary.
- Work Order A work order is the execution unit that tells the floor what to make, how many, and under what conditions. It is the anchor that production results and quality history attach to.
- Traceability Traceability is the ability to go from a finished product back to the material, process conditions and operators behind it — and forward from a given material to every product it went into.
- Nonconformance A nonconformance is any product or process that fails to meet a defined requirement. Recording when it was found and how it was dispositioned is where quality management starts.
Related implementation guides
Step-by-step articles on the same topics.
- Shop-floor entrypeople actually use Systems that go live and then go unused are common. The cause is design, not willingness. When entry increases and nothing comes back, no system holds.
- Phased rollout:choosing phase one Advice to go in phases is common; what phase one should be is not. Three criteria apply: the effect must be visible, the data must be easy to obtain, and failure must not stop production.