Glossary · Bill of Materials

BOM

A Bill of Materials (BOM) is the structured list of which parts, and how many of each, go into one finished product.

How it connects

  1. Finished product

    Item to produce

  2. Subassemblies

    Constituent assemblies

  3. Materials · Parts

    Required quantities and revisions

Definition

Definition

A Bill of Materials (BOM) is the structured list of which parts, and how many of each, go into one finished product.

In more detail

A BOM expresses the parts and quantities that make up a product, and how those parts are themselves built from lower-level items, as a tree. Purchasing orders against it; production stages material against it.

For execution, the BOM matters because it is the basis for issue verification. Comparing the BOM attached to a work order against what is actually scanned on the floor blocks a wrong part at the moment it happens.

A frequent difficulty is the difference between the engineering BOM and the manufacturing BOM. Engineering structures by function, manufacturing by build sequence, so using one for the other leaves the floor with instructions that do not match reality.

How it is used on the floor

  • Attach it to work orders so the floor sees required parts and quantities.
  • Verify scanned material against it to block mis-issue.
  • Derive material consumption from production results and post it to inventory.

Engineering BOM versus manufacturing BOM

The engineering BOM says what the product is made of; the manufacturing BOM says in what order it is built. The latter carries sub-assemblies and process steps. Conflating them produces work instructions that do not match the actual sequence.

Related terms

Terms that make more sense read together.

Related products

What IYULAB provides in this area.

Quick Answers

BOM — frequently asked

Questions that come up when evaluating BOM.

Should the BOM live in ERP or MES?

Master data is normally owned by ERP and consumed by MES for execution. Without ERP, MES may own it. What matters is choosing one system of record.

Our BOMs change often. How do we manage that?

Keep revisions, and record which revision a work order was released against. That is what lets you reconstruct how a given lot was actually built.

Can we run MES without a BOM?

Production counting and work history will function. Material issue verification and automatic consumption will not.

How would this apply to your plant?

A look at your equipment and current workflow is usually enough to scope it.