Definition
A Bill of Materials (BOM) is the structured list of which parts, and how many of each, go into one finished product.
A Bill of Materials (BOM) is the structured list of which parts, and how many of each, go into one finished product.
Item to produce
Constituent assemblies
Required quantities and revisions
A Bill of Materials (BOM) is the structured list of which parts, and how many of each, go into one finished product.
A BOM expresses the parts and quantities that make up a product, and how those parts are themselves built from lower-level items, as a tree. Purchasing orders against it; production stages material against it.
For execution, the BOM matters because it is the basis for issue verification. Comparing the BOM attached to a work order against what is actually scanned on the floor blocks a wrong part at the moment it happens.
A frequent difficulty is the difference between the engineering BOM and the manufacturing BOM. Engineering structures by function, manufacturing by build sequence, so using one for the other leaves the floor with instructions that do not match reality.
The engineering BOM says what the product is made of; the manufacturing BOM says in what order it is built. The latter carries sub-assemblies and process steps. Conflating them produces work instructions that do not match the actual sequence.
Terms that make more sense read together.
Enterprise Resource Planning (ERP) ties orders, purchasing, inventory and accounting into on…
SystemsA Manufacturing Execution System (MES) records and manages how a work order is actually carr…
SystemsA work order is the execution unit that tells the floor what to make, how many, and under wh…
QualityTraceability is the ability to go from a finished product back to the material, process cond…
What IYULAB provides in this area.
Questions that come up when evaluating BOM.
Master data is normally owned by ERP and consumed by MES for execution. Without ERP, MES may own it. What matters is choosing one system of record.
Keep revisions, and record which revision a work order was released against. That is what lets you reconstruct how a given lot was actually built.
Production counting and work history will function. Material issue verification and automatic consumption will not.
A look at your equipment and current workflow is usually enough to scope it.
Talk to an engineer