Autonomous Factory

Autonomous
factory program

A leading-model program that uses AI and digital twins for real-time monitoring, analysis and prediction so that operators intervene as little as possible. It is the next step for companies already at intermediate 1.

Cap
KRW 600M / 2 years
Support ratio
Up to 50%
2027 projects
About 30

Figures below follow the Ministry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call", published 30 October 2026. The integrated call is an advance notice; detailed requirements and deadlines are fixed in each program's own call.

Path to an autonomous factory

  1. Intermediate 1+

    Build or level check

  2. Real-time data

    Key equipment and processes

  3. AI anomaly prediction

    Early warning · analysis

  4. Digital twin

    Simulation · optimal design

Both the adopter and the supplier requirements must be met.

Check first

Eligibility is restricted

Adopters must have built an intermediate-1 smart factory or hold an intermediate-1 level check. Suppliers must be registered smart manufacturing specialist companies with AI and digital-twin control capability.

What the program is

Supports AI on key equipment and processes to collect and analyse real-time data and predict equipment anomalies, and digital twins that simulate variables of new processes in advance to find the best process design and operation.

Terms are up to 50% of total cost, KRW 600 million over two years (KRW 300 million a year), about 30 projects. Per the schedule, call, applications and selection follow the government general type (call Nov '26, applications Nov '26–Jan '27, selection Jan–Mar '27).

Suppliers come from smart manufacturing specialist companies being designated after review and site inspection; round 1 results are due on 19 November and round 2 in mid-December on smart-factory.kr.

Support terms

Per the 2027 integrated call.

Item2027 integrated call
AdopterManufacturers that built an intermediate-1 smart factory or hold an intermediate-1 level check
SupplierRegistered smart manufacturing specialist companies with AI and digital-twin control capability, or consortia
ScopeAI for real-time data analysis and anomaly prediction; digital-twin simulation and optimal process design
ProjectsAbout 30
CapUp to 50% · KRW 600M over 2 years (KRW 300M a year)
ScheduleCall Nov '26 · applications Nov '26–Jan '27 · selection Jan–Mar '27

How to apply

The steps are broadly the same across programs.

  1. STEP 01

    Check the individual call

    The integrated call announces the year in advance. Requirements and deadlines are fixed in each program's own call, published on the Ministry website (mss.go.kr) and the smart factory portal (smart-factory.kr).

  2. STEP 02

    Site diagnosis and target level

    Decide which processes and metrics to improve and check equipment communication and available data. Smart factory build programs require a target level under KS X 9001-1 (intermediate 1 or higher, for example).

  3. STEP 03

    Business plan with a supplier

    Work out scope, cost and schedule with the supplier. Some programs, such as robot adoption, require the adopting company and the supplier to apply as a consortium.

  4. STEP 04

    Apply online

    Sign up on smart-factory.kr, log in, then Program management → Project application → enter the business plan. R&D programs such as Multi AI Agent development are applied for on IRIS (iris.go.kr).

  5. STEP 05

    Evaluation, selection and agreement

    After document and site evaluation, selected companies sign an agreement and start the build. Changing scope after the agreement needs a separate procedure, so fix the scope at the planning stage.

  6. STEP 06

    Build, inspection and follow-up

    The result is inspected and costs are settled. Maintenance and upgrades can continue through follow-up programs such as the manufacturing DX mentor group's after-care support.

Where to apply and ask

ItemDetails
ApplySmart factory portal
EnquiriesTIPA (Korea Technology and Information Promotion Agency for SMEs) +82-44-300-0952, 0959

What to prepare

Having these ready speeds up the plan.

  • Business registration and latest financial statements
  • Target process or line, current problems and the metrics you want to improve
  • Equipment list with communication methods (maker and year if possible)
  • Systems in use (ERP, MES) and integration needs
  • Previous smart factory projects and current level (basic, intermediate 1, intermediate 2)
  • Desired scope and timing

Common pitfalls

Watch out

Prove your level first

Without an intermediate-1 build history, a level check (fully funded) is the way in.

Watch out

The supplier pool is narrow

Only designated specialist companies can take part, and the application window after designation is short.

Compare other programs

The right program depends on your situation.

Quick Answers

Autonomous factory program: quick answers

What companies most often check when reviewing the 2027 call.

Who can apply for the autonomous factory program?

Manufacturers that built an intermediate-1 smart factory or hold an intermediate-1 level check, working with a registered smart manufacturing specialist supplier.

How much does the autonomous factory program pay?

Up to 50% of total cost, KRW 600 million over two years (KRW 300 million a year), for about 30 projects in 2027.

How does it differ from the manufacturing AI track?

The AI track applies AI to specific processes; the autonomous factory is a factory-wide leading model using AI and digital twins, with an intermediate-1 entry requirement.

Sources and standards

Figures on this page follow the notice below. The integrated call is an advance notice; requirements and deadlines are fixed in each program's own call.

Key facts
TopicAutonomous factory program
SectionSmart factory grants
Standards appliedMinistry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call" (30 October 2026)
Public recordGS certification grade 1 · 7 patents registered
Reviewed byIYULAB engineering team
Last updated

Public record: GS certification grade 1 (U-CMMS 3.0, Telecommunications Technology Association) · 7 registered patents (10-2141840, 10-2141847, 10-2147747, 10-2354546, 10-2408497, 10-2408501, 10-2698341; searchable by number on KIPRIS) · Certifications and patentsReviewed by the IYULAB engineering team · Last updated:

Let us find the program that fits your site

Once we see your equipment and the scope you want, the right program becomes clear.

Request a consultation
KRKO