Check first
Adopters must have built an intermediate-1 smart factory or hold an intermediate-1 level check. Suppliers must be registered smart manufacturing specialist companies with AI and digital-twin control capability.
A leading-model program that uses AI and digital twins for real-time monitoring, analysis and prediction so that operators intervene as little as possible. It is the next step for companies already at intermediate 1.
Figures below follow the Ministry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call", published 30 October 2026. The integrated call is an advance notice; detailed requirements and deadlines are fixed in each program's own call.
Build or level check
Key equipment and processes
Early warning · analysis
Simulation · optimal design
Adopters must have built an intermediate-1 smart factory or hold an intermediate-1 level check. Suppliers must be registered smart manufacturing specialist companies with AI and digital-twin control capability.
Supports AI on key equipment and processes to collect and analyse real-time data and predict equipment anomalies, and digital twins that simulate variables of new processes in advance to find the best process design and operation.
Terms are up to 50% of total cost, KRW 600 million over two years (KRW 300 million a year), about 30 projects. Per the schedule, call, applications and selection follow the government general type (call Nov '26, applications Nov '26–Jan '27, selection Jan–Mar '27).
Suppliers come from smart manufacturing specialist companies being designated after review and site inspection; round 1 results are due on 19 November and round 2 in mid-December on smart-factory.kr.
Per the 2027 integrated call.
| Item | 2027 integrated call |
|---|---|
| Adopter | Manufacturers that built an intermediate-1 smart factory or hold an intermediate-1 level check |
| Supplier | Registered smart manufacturing specialist companies with AI and digital-twin control capability, or consortia |
| Scope | AI for real-time data analysis and anomaly prediction; digital-twin simulation and optimal process design |
| Projects | About 30 |
| Cap | Up to 50% · KRW 600M over 2 years (KRW 300M a year) |
| Schedule | Call Nov '26 · applications Nov '26–Jan '27 · selection Jan–Mar '27 |
The steps are broadly the same across programs.
The integrated call announces the year in advance. Requirements and deadlines are fixed in each program's own call, published on the Ministry website (mss.go.kr) and the smart factory portal (smart-factory.kr).
Decide which processes and metrics to improve and check equipment communication and available data. Smart factory build programs require a target level under KS X 9001-1 (intermediate 1 or higher, for example).
Work out scope, cost and schedule with the supplier. Some programs, such as robot adoption, require the adopting company and the supplier to apply as a consortium.
Sign up on smart-factory.kr, log in, then Program management → Project application → enter the business plan. R&D programs such as Multi AI Agent development are applied for on IRIS (iris.go.kr).
After document and site evaluation, selected companies sign an agreement and start the build. Changing scope after the agreement needs a separate procedure, so fix the scope at the planning stage.
The result is inspected and costs are settled. Maintenance and upgrades can continue through follow-up programs such as the manufacturing DX mentor group's after-care support.
| Item | Details |
|---|---|
| Apply | Smart factory portal |
| Enquiries | TIPA (Korea Technology and Information Promotion Agency for SMEs) +82-44-300-0952, 0959 |
Having these ready speeds up the plan.
Without an intermediate-1 build history, a level check (fully funded) is the way in.
Only designated specialist companies can take part, and the application window after designation is short.
The right program depends on your situation.
Caps, ratios and call dates for 20 programs in 9 areas, plus regional contacts, in one table.
Government TypeThe basic smart factory build grant that SMEs and mid-sized manufacturers apply for directly, with no lead org…
Manufacturing AIAn AI smart factory program for process optimization and predictive maintenance tailored to each industry and …
Robot & AutomationTwo programs: one supports robot automation systems, the other automation and digitalization of production equ…
Smart Factory Level CheckAn official assessment of how smart your factory is. The cost is fully funded, and the certificate counts as p…
Physical AIA demonstration program that puts robots and AI on the shop floor to replace manual and hazardous work. It run…
Win-Win TypeA partner organization such as a large company shares the cost and the government adds support. In 2027 it run…
What companies most often check when reviewing the 2027 call.
Manufacturers that built an intermediate-1 smart factory or hold an intermediate-1 level check, working with a registered smart manufacturing specialist supplier.
Up to 50% of total cost, KRW 600 million over two years (KRW 300 million a year), for about 30 projects in 2027.
The AI track applies AI to specific processes; the autonomous factory is a factory-wide leading model using AI and digital twins, with an intermediate-1 entry requirement.
Figures on this page follow the notice below. The integrated call is an advance notice; requirements and deadlines are fixed in each program's own call.
| Topic | Autonomous factory program |
|---|---|
| Section | Smart factory grants |
| Standards applied | Ministry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call" (30 October 2026) |
| Public record | GS certification grade 1 · 7 patents registered |
| Reviewed by | IYULAB engineering team |
| Last updated |
Public record: GS certification grade 1 (U-CMMS 3.0, Telecommunications Technology Association) · 7 registered patents (10-2141840, 10-2141847, 10-2147747, 10-2354546, 10-2408497, 10-2408501, 10-2698341; searchable by number on KIPRIS) · Certifications and patentsReviewed by the IYULAB engineering team · Last updated:
Once we see your equipment and the scope you want, the right program becomes clear.
Request a consultation