A demonstration program that puts robots and AI on the shop floor to replace manual and hazardous work. It runs for three years from 2027 with KRW 506.1 billion in total.
Figures below follow the Ministry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call", published 30 October 2026. The integrated call is an advance notice; detailed requirements and deadlines are fixed in each program's own call.
Turning tacit work into data
Worker safety
PoC → PoV → commercialization
"Smart factory" flagship model
The integrated call outlines the structure and scale; details are fixed in the main call.
Validates physical AI leading models for SME manufacturing and creates models for wider rollout. Period 2027–2029; total KRW 506.1 billion (KRW 414.4 billion government, KRW 91.7 billion private); support 70–100%.
①Manual-work demonstration: robotics replaces manual work in export-led K-beauty, K-food and K-fashion processes and learns operators' know-how. ②Hazardous-process demonstration: robots and safety devices for casting, moulding, forming, welding and surface treatment in root industries, with standard models per process.
③Public–private technology demonstration: matches anchor companies' needs with physical AI start-ups, specialist companies and R&D-strong SMEs, from PoC to PoV and commercialization. ④Integrated demonstration: integrates robots, sensors, equipment and AI models factory-wide with a data collection and use system.
Per the 2027 integrated call.
| Item | 2027 integrated call |
|---|---|
| Manual-work demonstration | 79 · up to 24 months · KRW 1B · 70% — SMEs with export-led manual processes |
| Hazardous-process demonstration | 39 · up to 24 months · KRW 2B · 70% — root-industry SMEs with hazardous processes |
| Public–private technology demonstration | 205 · up to 12 months · KRW 400M · 100% — physical AI start-ups and specialist SMEs |
| Integrated demonstration | 40 · up to 36 months · KRW 4.9B · 70% — SMEs integrating proven physical AI across processes |
| Total budget | KRW 506.1B (government 414.4B, private 91.7B) |
| Main call | Expected in the first half of 2027 |
The steps are broadly the same across programs.
The integrated call announces the year in advance. Requirements and deadlines are fixed in each program's own call, published on the Ministry website (mss.go.kr) and the smart factory portal (smart-factory.kr).
Decide which processes and metrics to improve and check equipment communication and available data. Smart factory build programs require a target level under KS X 9001-1 (intermediate 1 or higher, for example).
Work out scope, cost and schedule with the supplier. Some programs, such as robot adoption, require the adopting company and the supplier to apply as a consortium.
Sign up on smart-factory.kr, log in, then Program management → Project application → enter the business plan. R&D programs such as Multi AI Agent development are applied for on IRIS (iris.go.kr).
After document and site evaluation, selected companies sign an agreement and start the build. Changing scope after the agreement needs a separate procedure, so fix the scope at the planning stage.
The result is inspected and costs are settled. Maintenance and upgrades can continue through follow-up programs such as the manufacturing DX mentor group's after-care support.
| Item | Details |
|---|---|
| Enquiries | TIPA (Korea Technology and Information Promotion Agency for SMEs) +82-44-300-0904 |
| Calls | Ministry of SMEs and Startups · Smart factory portal |
Having these ready speeds up the plan.
Recorded task sequences, judgement criteria and defect cases make a demonstration plan concrete.
Factory-wide integration needs one place to collect and use data; MES and equipment data collection help.
The right program depends on your situation.
Caps, ratios and call dates for 20 programs in 9 areas, plus regional contacts, in one table.
Government TypeThe basic smart factory build grant that SMEs and mid-sized manufacturers apply for directly, with no lead org…
Manufacturing AIAn AI smart factory program for process optimization and predictive maintenance tailored to each industry and …
Autonomous FactoryA leading-model program that uses AI and digital twins for real-time monitoring, analysis and prediction so th…
Robot & AutomationTwo programs: one supports robot automation systems, the other automation and digitalization of production equ…
Smart Factory Level CheckAn official assessment of how smart your factory is. The cost is fully funded, and the certificate counts as p…
Win-Win TypeA partner organization such as a large company shares the cost and the government adds support. In 2027 it run…
What companies most often check when reviewing the 2027 call.
The main call is expected in the first half of 2027; details are fixed there.
KRW 506.1 billion in total over 2027–2029, with support ratios of 70–100% by type.
Manual-heavy processes: manual-work demo; casting, welding or surface treatment: hazardous-process demo; physical AI technology companies: public–private demo; factory-wide integration: integrated demo.
Figures on this page follow the notice below. The integrated call is an advance notice; requirements and deadlines are fixed in each program's own call.
| Topic | SME physical AI demonstration |
|---|---|
| Section | Smart factory grants |
| Standards applied | Ministry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call" (30 October 2026) |
| Public record | GS certification grade 1 · 7 patents registered |
| Reviewed by | IYULAB engineering team |
| Last updated |
Public record: GS certification grade 1 (U-CMMS 3.0, Telecommunications Technology Association) · 7 registered patents (10-2141840, 10-2141847, 10-2147747, 10-2354546, 10-2408497, 10-2408501, 10-2698341; searchable by number on KIPRIS) · Certifications and patentsReviewed by the IYULAB engineering team · Last updated:
Once we see your equipment and the scope you want, the right program becomes clear.
Request a consultation