Smart Factory Level Check

Smart factory
level check

An official assessment of how smart your factory is. The cost is fully funded, and the certificate counts as proof of eligibility for higher-level programs such as the autonomous factory.

Support ratio
100%
2027 companies
About 2,000
Applications
Rolling

Figures below follow the Ministry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call", published 30 October 2026. The integrated call is an advance notice; detailed requirements and deadlines are fixed in each program's own call.

Where the level check is used

  1. Apply

    Rolling

  2. Site assessment

    Certified assessors

  3. Certificate

    With diagnostic report

  4. Next program

    Autonomous factory, etc.

The result serves as eligibility evidence for higher-level programs.

Check first

Rolling applications

Call in January 2027, then applications and assessments on a rolling basis for about 2,000 companies.

What the program is

Supports smartness level assessments so that SMEs and mid-sized manufacturers build and upgrade smart factories on their own. Participants receive a level certificate and a diagnostic report at no cost.

Eligible: companies that built a smart factory with their own resources without a government program, companies whose voluntary upgrades are expected to raise their level, and companies whose certificate has expired.

The autonomous factory program accepts "intermediate 1 or higher by level check" as adopter eligibility, so for self-built factories the level check is the way into higher programs.

Support terms

Per the 2027 integrated call.

Item2027 integrated call
EligibilitySelf-built smart factories (no government program), companies expected to level up, expired certificates
ProvidedLevel certificate and diagnostic report
Support ratio100% of the assessment cost
ScaleAbout 2,000 companies
ScheduleCall Jan '27 · rolling applications

How to apply

The steps are broadly the same across programs.

  1. STEP 01

    Check the individual call

    The integrated call announces the year in advance. Requirements and deadlines are fixed in each program's own call, published on the Ministry website (mss.go.kr) and the smart factory portal (smart-factory.kr).

  2. STEP 02

    Site diagnosis and target level

    Decide which processes and metrics to improve and check equipment communication and available data. Smart factory build programs require a target level under KS X 9001-1 (intermediate 1 or higher, for example).

  3. STEP 03

    Business plan with a supplier

    Work out scope, cost and schedule with the supplier. Some programs, such as robot adoption, require the adopting company and the supplier to apply as a consortium.

  4. STEP 04

    Apply online

    Sign up on smart-factory.kr, log in, then Program management → Project application → enter the business plan. R&D programs such as Multi AI Agent development are applied for on IRIS (iris.go.kr).

  5. STEP 05

    Evaluation, selection and agreement

    After document and site evaluation, selected companies sign an agreement and start the build. Changing scope after the agreement needs a separate procedure, so fix the scope at the planning stage.

  6. STEP 06

    Build, inspection and follow-up

    The result is inspected and costs are settled. Maintenance and upgrades can continue through follow-up programs such as the manufacturing DX mentor group's after-care support.

Where to apply and ask

ItemDetails
ApplySmart factory portal
EnquiriesTIPA (Korea Technology and Information Promotion Agency for SMEs) +82-44-300-0955

What to prepare

Having these ready speeds up the plan.

  • Business registration and latest financial statements
  • Target process or line, current problems and the metrics you want to improve
  • Equipment list with communication methods (maker and year if possible)
  • Systems in use (ERP, MES) and integration needs
  • Previous smart factory projects and current level (basic, intermediate 1, intermediate 2)
  • Desired scope and timing

Common pitfalls

Watch out

Built with a government grant?

The main targets are self-built factories and expired certificates. Check the level judged at the end of your grant first.

Watch out

Operation is assessed, not software

Installing systems does not raise the level by itself; whether data is collected and used in decisions is what is assessed.

Compare other programs

The right program depends on your situation.

Quick Answers

Smart factory level check: quick answers

What companies most often check when reviewing the 2027 call.

How much does a smart factory level check cost?

Under the 2027 call it is fully funded; the company receives the certificate and diagnostic report at no cost.

Who can get a level check?

Companies that built a smart factory on their own, companies expected to level up through voluntary upgrades, and companies whose certificate has expired.

What is a level check used for?

The autonomous factory program accepts an intermediate-1 level check as eligibility, and it anchors the current and target levels in build-program plans.

Sources and standards

Figures on this page follow the notice below. The integrated call is an advance notice; requirements and deadlines are fixed in each program's own call.

Key facts
TopicSmart factory level check
SectionSmart factory grants
Standards appliedMinistry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call" (30 October 2026)
Public recordGS certification grade 1 · 7 patents registered
Reviewed byIYULAB engineering team
Last updated

Public record: GS certification grade 1 (U-CMMS 3.0, Telecommunications Technology Association) · 7 registered patents (10-2141840, 10-2141847, 10-2147747, 10-2354546, 10-2408497, 10-2408501, 10-2698341; searchable by number on KIPRIS) · Certifications and patentsReviewed by the IYULAB engineering team · Last updated:

Let us find the program that fits your site

Once we see your equipment and the scope you want, the right program becomes clear.

Request a consultation
KRKO