Check first
Call in January 2027, then applications and assessments on a rolling basis for about 2,000 companies.
An official assessment of how smart your factory is. The cost is fully funded, and the certificate counts as proof of eligibility for higher-level programs such as the autonomous factory.
Figures below follow the Ministry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call", published 30 October 2026. The integrated call is an advance notice; detailed requirements and deadlines are fixed in each program's own call.
Rolling
Certified assessors
With diagnostic report
Autonomous factory, etc.
Call in January 2027, then applications and assessments on a rolling basis for about 2,000 companies.
Supports smartness level assessments so that SMEs and mid-sized manufacturers build and upgrade smart factories on their own. Participants receive a level certificate and a diagnostic report at no cost.
Eligible: companies that built a smart factory with their own resources without a government program, companies whose voluntary upgrades are expected to raise their level, and companies whose certificate has expired.
The autonomous factory program accepts "intermediate 1 or higher by level check" as adopter eligibility, so for self-built factories the level check is the way into higher programs.
Per the 2027 integrated call.
| Item | 2027 integrated call |
|---|---|
| Eligibility | Self-built smart factories (no government program), companies expected to level up, expired certificates |
| Provided | Level certificate and diagnostic report |
| Support ratio | 100% of the assessment cost |
| Scale | About 2,000 companies |
| Schedule | Call Jan '27 · rolling applications |
The steps are broadly the same across programs.
The integrated call announces the year in advance. Requirements and deadlines are fixed in each program's own call, published on the Ministry website (mss.go.kr) and the smart factory portal (smart-factory.kr).
Decide which processes and metrics to improve and check equipment communication and available data. Smart factory build programs require a target level under KS X 9001-1 (intermediate 1 or higher, for example).
Work out scope, cost and schedule with the supplier. Some programs, such as robot adoption, require the adopting company and the supplier to apply as a consortium.
Sign up on smart-factory.kr, log in, then Program management → Project application → enter the business plan. R&D programs such as Multi AI Agent development are applied for on IRIS (iris.go.kr).
After document and site evaluation, selected companies sign an agreement and start the build. Changing scope after the agreement needs a separate procedure, so fix the scope at the planning stage.
The result is inspected and costs are settled. Maintenance and upgrades can continue through follow-up programs such as the manufacturing DX mentor group's after-care support.
| Item | Details |
|---|---|
| Apply | Smart factory portal |
| Enquiries | TIPA (Korea Technology and Information Promotion Agency for SMEs) +82-44-300-0955 |
Having these ready speeds up the plan.
The main targets are self-built factories and expired certificates. Check the level judged at the end of your grant first.
Installing systems does not raise the level by itself; whether data is collected and used in decisions is what is assessed.
The right program depends on your situation.
Caps, ratios and call dates for 20 programs in 9 areas, plus regional contacts, in one table.
Government TypeThe basic smart factory build grant that SMEs and mid-sized manufacturers apply for directly, with no lead org…
Manufacturing AIAn AI smart factory program for process optimization and predictive maintenance tailored to each industry and …
Autonomous FactoryA leading-model program that uses AI and digital twins for real-time monitoring, analysis and prediction so th…
Robot & AutomationTwo programs: one supports robot automation systems, the other automation and digitalization of production equ…
Physical AIA demonstration program that puts robots and AI on the shop floor to replace manual and hazardous work. It run…
Win-Win TypeA partner organization such as a large company shares the cost and the government adds support. In 2027 it run…
What companies most often check when reviewing the 2027 call.
Under the 2027 call it is fully funded; the company receives the certificate and diagnostic report at no cost.
Companies that built a smart factory on their own, companies expected to level up through voluntary upgrades, and companies whose certificate has expired.
The autonomous factory program accepts an intermediate-1 level check as eligibility, and it anchors the current and target levels in build-program plans.
Figures on this page follow the notice below. The integrated call is an advance notice; requirements and deadlines are fixed in each program's own call.
| Topic | Smart factory level check |
|---|---|
| Section | Smart factory grants |
| Standards applied | Ministry of SMEs and Startups Notice No. 2026-620, "2027 Smart Manufacturing Innovation Support Programs: Integrated Call" (30 October 2026) |
| Public record | GS certification grade 1 · 7 patents registered |
| Reviewed by | IYULAB engineering team |
| Last updated |
Public record: GS certification grade 1 (U-CMMS 3.0, Telecommunications Technology Association) · 7 registered patents (10-2141840, 10-2141847, 10-2147747, 10-2354546, 10-2408497, 10-2408501, 10-2698341; searchable by number on KIPRIS) · Certifications and patentsReviewed by the IYULAB engineering team · Last updated:
Once we see your equipment and the scope you want, the right program becomes clear.
Request a consultation