Company A · Injection molding

Real-time injection equipment integration and MES production management

Injection molding shot, temperature, and pressure data were collected in real time, connected to MES, and used to automate manual production counting.

An injection molding machine and a bin of molded components — AI-generated illustration
IndustryInjection molding
Connected dataShot signals, temperature and pressure, production results, and equipment status
Measured result100% production counting accuracy and an 80% reduction in administrator work time

Implementation

Equipment signals replaced manual counting, while a monitoring view gave managers a consistent view of production and equipment operation.

Outcome

Recording production from the shot signal removed the gap between manual counts and actual output, bringing counting accuracy to 100% and cutting the time administrators spent reconciling counts by 80%.

100% production counting accuracy and an 80% reduction in administrator work time

Validation method

Automated counts were reconciled with production records, and administrator counting time was compared before and after implementation.

Terms used in this case study

Definitions follow the IYULAB manufacturing glossary.

  • MES A Manufacturing Execution System (MES) records and manages how a work order is actually carried out on the shop floor, in real time. It closes the gap between what was planned and what happened.
  • OEE Overall Equipment Effectiveness (OEE) expresses how much of its planned time a machine actually delivered, as a single ratio combining availability, performance and quality.
  • PLC A PLC is the industrial controller that actually runs a machine. It reads sensor inputs, applies fixed logic and drives outputs — and it already holds most of the numbers a factory wants to measure.

Related implementation guides

Step-by-step articles on the same topics.

  • MES:what to decide first MES projects usually go wrong before product selection, not during it. If nobody has decided what counts as one record, or what counts as output, the same problems appear whichever product you buy.
  • Getting data out ofolder equipment "Our machines are too old for that" is a verdict usually reached before anyone surveys. In practice a large share already emit a signal that can be read.

Quick Answers

Key answers about this implementation

The connected data, operational change, and validation basis at a glance.

What data was connected?

Shot signals, temperature and pressure, production results, and equipment status

What changed operationally?

Equipment signals replaced manual counting, while a monitoring view gave managers a consistent view of production and equipment operation.

How was the result validated?

Automated counts were reconciled with production records, and administrator counting time was compared before and after implementation.

Sources and standards

Terms and procedures on this page follow the public standards and official sources below. Figures are as of each source's publication date.

Key facts
TopicReal-time injection equipment integration and MES production management | IYULAB
SectionCase Studies
Standards appliedISA-95 (IEC 62264), Enterprise-Control System Integration · ISO 22400-2:2014, Key performance indicators for manufacturing operations management · Smart Manufacturing Innovation Agency, smart factory programme portal (smart-factory.kr)
Public recordGS certification grade 1 of 2 grades · 7 patents registered
Reviewed byIYULAB engineering team
Last updated

Public record: GS certification, grade 1 of 2 grades (U-CMMS 3.0, Telecommunications Technology Association) · 7 patents registered (10-2141840, 10-2141847, 10-2147747, 10-2354546, 10-2408497, 10-2408501, 10-2698341; searchable by number on KIPRIS) · Certifications and patentsReviewed by the IYULAB engineering team · Last updated:

Imagery: AI-generated scenes illustrating the subject of this page.

KR KO